India

Experimental investigations of long stick wood gasification in a bottom lit updraft fixed bed gasifier

Experimental investigations of long stick wood gasification in a bottom lit updraft fixed bed gasifier
A. A. Saravanakumar, Spray Engineering Devices Limited, Noida, Uttar Pradesh, India, July 17, 2008

Studies on Small Scale Biomass Gasifier Based Decentralized Energy Generation Systems

Case Studies on Small Scale Biomass Gasifier Based Decentralized Energy Generation Systems
G. Sridhar, H. V. Sridhar, Basawaraj, M.S.Sudarshan H. I. Somsekhar, S. Dasappa and, P. J.Paul

Combustion Gasification and Propulsion Laboratory, Centre for Sustainable Technologies, Indian Institute of Science
Bangalore, India

India: Gasification of bamboo for electricity

Gasification of bamboo for electricity

Government of India, Ministry of Science and Technology, DEPARTMENT OF SCIENCE AND TECHNOLOGY (DST) 2007

NMBA, National Mission on Bamboo Applications http://www.bambootech.org

DST/ NMBA has approved the establishment of a 25 Kwe fabricated
gasifier with producer gas engine at Namsai, Lohit district.

DST/ NMBA has approved the establishment of a 25 Kwe (35 kg/
hour) gasifier to provide electricity for a residential educational
establishment (Central Institute of Himalayan Culture Studies,
Dahung) in Arunachal Pradesh.
DST/ NMBA will support, for off-grid and remote villages,
a programme of induction of 6 bamboo gasifiers in 2007 (in
the 25 Kwe - 75 Kwe range), to provide electricity to villages,
or to institutions (residential schools, health sub-centres,
small enterprises).

http://dst.gov.in/admin_finance/ls_9/un_sq561.htm

List of Gasifier Manufacturers working in collaboration with NMBA for induction of bamboo based gasifier systems

Companies: 

RADHE Renewable Energy Development Associates (2005)

We are engaged in the manufacturing of renewable and non-conventional energy equipments. i.e. briquetting plants and biomass gasifiers.

Activities: manufacturing briquetting plants JUMBO 90 model with production capacity of 500 to 1500 kgs per hour, with an added benefit ;JUMBO 90 does not require hammer mill or sizing machine since residuals of upto 25mm can be fed directly. Moreover, it has been developed for minimum consumption of power and maintenance.

Companies: 

Pages

Subscribe to India