Greg Manning, Canadian Gasifier Ltd, September, 2010
I'm running a gasifier that to date, ran continuous (without shutdown) for
2 months, this was the limit of the steels used to build the unit, upon examination the delamination of the steel in the internal "hot spot" areas was so severe that these areas had to be replaced with new items. not once but twice during the heating season.
we have moved away from steels in these critical areas, and on to refractory, and are preparing for a new set of tests this coming winter (this is a building heating only gasifier).
view through the tuyere here:
Greg Manning,
Canadian Gasifier Ltd.
Building Hi-Performance Gasifiers, Since 2001